Cost Proposal Review & Support

Prepare accurate, DCAA-compliant cost proposals with defensible pricing, compliant rate structures, and audit-ready financial documentation.

GovCon Compliance - Accounting

Government Contract Cost Proposal Preparation and Review

A cost proposal is more than a budget estimate - it is a financial commitment that government contracting officers and DCAA will scrutinize for accuracy, consistency, and regulatory alignment. Weak proposals are rejected, questioned, or flagged for audit before the contract is even awarded. Our Cost Proposal Review & Support service ensures every figure in your proposal is defensible, supported, and aligned with your actual books.

What We Do

What You Get
Key Outcome

Your cost proposal stops being the reason you lose or delay a contract. DCAA finds the data credible, the documentation complete, and the rate calculations consistent with your historical financials – reducing the chance of a prolonged pre-award review.

Best suited for

Big idea 1: Rates

What is a rate?

Imagine a lemonade stand. The lemons cost money. So do the cups, the table, and the time you spend. A rate is an extra amount we add on top of one hour of work so the price covers everything, not just the worker’s pay.

There are four main pieces:

  • Pay per hour: what the worker earns for one hour.
  • Fringe: extras for workers, like health insurance, payroll taxes, and paid days off.
  • Overhead: helper costs for the work, like the office and equipment.
  • G&A: the cost of running the whole company, like the bookkeeper and the boss.

Why it matters.

Rates get used again and again, for every hour and every year. One small mistake grows like a snowball. If rates are too low, you lose money. If they are too high, someone else may win. If they are made up with nothing behind them, the checkers will ask questions.

What you do.

  1. Start with real pay. Take a person’s yearly pay and divide it by the hours in a work year (2,080 is common). Write down which number you used.
  2. Add a fair raise for next year, and write down why you picked it.
  3. Look at your old fringe, overhead, and G&A rates from your records.
  4. Use the old rates as a starting point. Then change them for things you know are coming, like a new office, new hires, or a big change in how much work you will have. Write down each change.
  5. Take out costs the government will not pay for before you do the math.
  6. Add each rate to the right thing. Each rate goes on the same thing it was figured from. G&A usually goes on the total of all your costs, including helpers you hire, supplies, and travel.
  7. Add profit last, on its own line.

Example. Maya is an engineer who earns $104,000 a year. (All the numbers here are pretend. They are not real or recommended rates.)

  • $104,000 ÷ 2,080 hours = $50.00 for one hour
  • Next year, with a 3% raise: $51.50 for one hour

Now let’s price 1,000 hours of Maya’s time. To keep it easy, we pretend overhead goes on her pay, and the G&A goes on all the costs in this example. We keep the cents so nothing gets rounded away.

StepMathAmount
Maya's pay1,000 × $51.50$51,500.00
Fringe (22%)$51,500 × 22%$11,330.00
Overhead (45%)$51,500 × 45%$23,175.00
Add those three$86,005.00
G&A (27.6%)$86,005 × 27.6%$23,737.38
Total cost$109,742.38
Profit (8%)$109,742.38 × 8%$8,779.39
Price$118,521.77

Every line has a reason and a place it came from. The raise comes from your pay rules. The rates come from your records. Profit comes last.

About profit. Profit is the extra money a company keeps for doing the job well. Some contracts put a limit on it. For one common kind (cost-plus-fixed-fee), the law caps profit at 15% of the estimated cost for research and development work, 10% for most other work, and 6% of the project cost for designing public buildings and utilities. The 8% above is just pretend, and the right amount depends on the contract. Some awards, like cost-sharing ones, have no profit at all.

Big idea 2: Proof (Backup)

What is it?

Proof is the pile of papers that answers, “How do you know?” It is like showing your teacher how you got your answer. Proof can be pay records, price quotes from helper companies, old bills, and notes about why you guessed a number.

Why it matters.

A number with no proof is called “unsupported.” The checkers may say no to it. Even a right number causes trouble if you cannot show where it came from. And once you send the price paper, it may be too late to add missing proof.

What you do.

  1. Make a list of every line in your price paper: workers, helper companies, supplies, and travel.
  2. Next to each line, write what proof you have.
  3. For workers, keep pay records and a short note on why you picked the number of hours.
  4. For helper companies and supplies, keep written price quotes, old orders, or price lists. For bigger helper jobs, you also need to show you checked that the price is fair.
  5. For travel, keep a simple plan: how many trips, where to, how long, and the price of each.
  6. For rates, keep all the math and the money record it came from.
  7. Put everything in one folder, named like the lines in your price paper.
  8. Ask someone who did not write it to follow the trail. If they get lost, a checker will too.

Example:

LineAmountProof We Keep
Workers$51,500Pay records, hours worked, raise note
Helper company$60,000Signed written price quote, plus a note that the price is fair
Supplies$8,200Two store price lists
Travel$4,500Trip plan: 3 trips × $1,500 each, with hotel and food costs

If a line has no proof, we mark it and fix it before you send. A number with nothing behind it is what causes trouble.

Big idea 3: Match your money records

What is it?

“Matching” means showing that the numbers in your price paper come from your real money records. If your price paper says overhead is 45%, your records should show how you got 45%. It is like checking that two copies of the same story are the same.

Why it matters.

Checkers put your price paper next to your records. If they do not match, they wonder which one is right. That wondering leads to questions, waiting, and sometimes a “no.” The fastest way to lose trust is to hand over rates nobody can rebuild.

What you do.

  1. Get your list of all money accounts and their totals for the last full year.
  2. Find the accounts that belong to fringe, overhead, and G&A.
  3. Add up each group and compare it to your rate paper.
  4. Find what each group is divided by (like worker pay) and check that it matches the records too.
  5. Take out costs the government will not pay for. Write down each one.
  6. Check that the group total, minus those costs, equals the number you used.
  7. Divide the group total by what it is divided by. That is your old rate.
  8. If your new rate is different, write down exactly why. For example, “New office adds $20,000 a year” or “We plan to hire more people.”
  9. Keep the worksheet, the records, and the notes together.

Example. Your overhead account shows $184,000. Here is what we find inside:

ItemAmount
Helper workers$95,000
Office space$60,000
Equipment$25,000
Client dinner and drinks (government will not pay)$4,000
Total in your records$184,000

We take out the $4,000 because the government will not pay for it. That leaves $180,000. Divide by workers’ pay of $400,000 and you get 45%. When a checker asks, “Where did 45% come from?” you show this page, your records, and the note about the $4,000. Everything tells the same story.

One more thing: staff morale costs, like a company party, can be okay for the government to pay for, but it depends on the facts, and the entertainment and alcohol parts are not allowed. Dinners to entertain clients, alcohol, and gifts are the usual problems. Costs the government clearly will not pay for must stay out of your price paper. On bigger contracts, they can also lead to fines if they slip into your year-end cost paperwork.

How it all fits together

Your records give you real numbers. The numbers become rates. The rates build the price. Proof backs up every step. If your records are messy, your rates wobble. If your rates wobble, your price is hard to defend. We check each step so the whole chain holds.

Other things checkers look for

  • Is it realistic? For some contracts, the government can change your numbers to what it thinks the job will really cost. Rates that are too low can hurt you, even if you are paid back for real costs.
  • Is your data true and complete? On bigger deals, you promise your information is current, accurate, and complete. If it is not, the government can ask for money back later.
  • Do you do things the same way every time? Your rates and groups should match how you say your company keeps its books.
  • Optional extras. Some companies can add a small cost for the money tied up in buildings and machines. It needs its own proof.

Who is this for?

  • Companies writing their first government price paper
  • Businesses that were told “no” before, or got lots of questions
  • Companies that bid on jobs where the government pays back real costs
  • Companies without much money help on the team

How we work together

We can help with one price paper or help you again and again. We plan around your due date

Questions people ask

What is a forward pricing rate, and how is it different from a billing rate?

A forward pricing rate is your best guess of your rates in the future. You use it to build a price. A billing rate is what you use on your bills while the work is happening. After the year ends, billing rates get fixed to match what you really spent. Both should match your records.

Can I use last year’s rates?

Often yes, as a starting point. Then change them for things you know will change, like rent, new hires, or raises. Also think about how much work you expect to have. A rate is a cost divided by an amount of work, so if either one changes, the rate changes. Write down each change and why.

What if my numbers do not match my records?

The checker will ask why. That can slow things down, cause questions, or lead to a “no.” That is why we compare them before you send.

Do I need to include profit?

Usually yes, if the contract allows it. Profit goes in last, on its own line, and it has to be fair and within any limits. Some awards have no profit.

What is a basis of estimate?

It is the story of how you came up with a number, like how many hours a job will take and why. A good one is short, clear, and points to proof.

What if I am a new company with little history?

That is common. We help you build rates from a budget and explain your thinking. As you grow, you can switch to rates from real history.

Who says yes or no to my price paper?

A person called the contracting officer decides. An office called DCAA helps by giving advice and checking the numbers when asked. They often look at your bookkeeping and your future rates before an award.

Grown-up notes

For readers who want the rule names behind the simple words:

  • Morale and welfare costs: FAR 31.205-13. Entertainment: FAR 31.205-14. Alcohol: FAR 31.205-51. Whether a specific party cost is allowable depends on the facts.
  • Penalties for expressly unallowable costs: FAR 42.709 and clause 52.242-3. They apply to final indirect cost rate proposals and certain fixed-price-incentive cost statements on covered contracts over $1 million.
  • Profit limits on cost-plus-fixed-fee contracts: 10 U.S.C. 3322, 41 U.S.C. 3905, and FAR 15.404-4(c)(4)(i). The limits are 15% for research and development, 10% for other work, and 6% for architect-engineer work on public works and utilities. DoD profit uses weighted guidelines: DFARS 215.404-71.
  • Forward pricing rates: FAR 15.407-3. Billing rates and year-end true-up: FAR 42.704.
  • Checking helper-company prices: FAR 15.404-3. Travel costs: FAR 31.205-46. Cost of money for facilities: FAR 31.205-10.
  • Accounting system review: SF 1408.

Important notice

This page is general information. It is not legal, accounting, or tax advice. All rates and dollar amounts in the examples are pretend. The FAR is being rewritten in 2026, so section numbers and wording may change. Check the current rules before you rely on them. Our service helps lower risk but cannot promise any audit, review, or award result.